Because of the high risk factor of aerial work, it is necessary to attach great importance to the safety measures of various structures of high-rise movable scaffolding. First of all, the foundation of the high-rise mobile scaffolding must be firm, calculated before the erection, meet the load requirements, and set up according to the construction specifications, do the drainage measures. At the same time, the scissors support and tie points of the high-level mobile scaffolding should be set as required.

 

Secondly, the horizontal and vertical sealing of the high-level movable scaffolding is usually closed from the first step, every other step or two steps, full of scaffolding or scaffolding, the scaffolding is laid along the long direction, and the joints should overlap. Shelving on a small crossbar, it is strictly forbidden to have a short board. And the system of safety and security is laid every four steps between the pole and the wall.

 

From the second step to the fifth step, each step requires a 1.00 m high protective sample railing and a footrest or a net to be placed on the inside of the outer pole, and the protective rod and the pole are fastened; Outside the poles, all safety or safety nets should be provided; in the streets or densely populated areas, all the outside should be provided with safety or safety nets.

 

After the high-rise mobile feet are erected, the steel pipes, fasteners, scaffolding boards and connection points shall not be removed at will. When necessary during construction, it must be approved by the person in charge of the construction site and take effective measures. Immediately after the completion of the process, it will be resumed.http://www.eg-scaffold.com/