Matters needing attention when using construction with active scaffolding

Jun 10, 2019

Active scaffolding For safety reasons, do not use defective or damaged parts; please follow the installation sequence and permissible load; please observe all points of attention in use and construction before the scaffolding moves, let all workers from the scaffolding platform Down to the ground. When the moving speed is less than 0.75 m / s, before moving, if the universal wheel fails to turn to the position due to ground friction, etc., do not force the bracket to cause damage to the wheel, and the bracket will fall over.


The bracket should be prevented from being subjected to sudden horizontal impact and impact; the load should be less than 200 kg per 1.8 m * 0.9 m working surface; it is strictly prohibited to hang heavy objects outside the bracket to prevent the bracket from tipping over the scaffolding due to severe eccentric load. The load capacity of the wheel is 200 kg / piece. Do not damage it due to overload.


After the scaffolding is moved into place, the brakes of the wheels should be stepped on to lock the wheels; the ladders should not be erected on the work platform; the two should be prevented from falling up and down by one side at the same time to prevent the scaffolding from falling over; if the scaffolding is erected over 2 floors, For safety reasons, a stable wing frame should be added.


The height of the scaffolding caster adjustment screw should be less than 250 mm; if the scaffolding exceeds 2 layers, it should be fixed with the wall to avoid tipping over. It is strictly forbidden to weld and punch the scaffold and other methods of damage to the scaffold during the fixing process. Construction or fixed. After the completion of the construction, the scaffolding should be dismantled from top to bottom. The parts should be transported one by one, or hanged one by one or other tools and methods to ensure that the scaffold is not damaged. Do not throw it directly.