What is the spacing of the members of the aluminum scaffolding and the scissors support

Jul 23, 2019

When aluminum scaffolding is constructed, the spacing between the poles, large crossbars and small crossbars shall comply with the specifications and construction requirements. When it is necessary to increase the spacing at the entrance, etc., it should be reinforced according to the specifications. The pole is the main force member of the aluminum scaffold, the spacing should be evenly set, the spacing can not be increased, otherwise the bearing capacity of the pole is reduced; the change of the step of the large rail also directly affects the bearing capacity of the scaffold, when the step is increased from 1.2m to At 1.8 m, the critical load drops by 27%.

Scissor support is an important measure to prevent longitudinal deformation of aluminum scaffolding. Reasonable setting of scissors supports can also enhance the overall rigidity of scaffolding and increase the carrying capacity of scaffolding by more than 12%. Each group of scissors supports 5 to 7 roots (>6m) across the pole, and the angle between the diagonal pole and the ground is between 45° and 60°. For single and double row scaffolds with a height below 24m, a set of scissors supports shall be provided at both ends of the outer façade, and the bottom to the top shall be continuously arranged with the erection of the scaffold; the middle portion may be spaced no more than 15m.

Double-row aluminum scaffolding with a height of 25m or more, the outer façade must be continuously set along the length and height. The scissor slanting bar should be connected to the upright bar and the extended small crossbar, and the lower end of the bottom slanting bar should be placed on the paddle. The length of the scissors slanting rods is overlapped, the lap length is not less than 0.5m, and two screw fasteners are provided.

When the aluminum scaffolding height exceeds 24m, in order to enhance the rigidity of the horizontal plane of the scaffold, a diagonal bar can be added in the horizontal plane at the corner of the scaffold and in the middle every 6th span to make it a zigzag or "ten". Glyph. When the operation layer is encountered, it can be temporarily removed. When transferring to other layers, it should be replenished in time.www.eg-scaffold.com